CFFBRWCFFBRWDocumentation
⚠Auto-generated documentation — This content was generated with AI assistance and is currently under review. Information may be incomplete or inaccurate. When in doubt, contact our support team.

Billing & Usage

CFFBRW uses a credit-based billing system. Every action that consumes compute or AI resources costs credits.

Plans

FreeProTeam
Credits/month1001,0005,000
Workflows550Unlimited
Runs/month50500Unlimited
MCP Servers21025
Cron Schedules110Unlimited
Plan VersioningLast 3Full historyFull history
Pre-validation (T2)NoYesYes

Credit Costs

ActionCreditsNotes
Compile a workflow (AI call)10Flat rate. If the compiler auto-retries to fix validation errors, the retry cost is absorbed by the platform — you still pay 10 credits.
Compile (cached, same markdown)0Same content hash = cache hit, no AI call.
Pre-validation / Screen (Pro+)3AI screens your markdown for issues before compilation.
Run a workflow1Per run (not per step).
AI recovery (Tier 2)5Per recovery attempt when a step fails and AI fixes it inline.
ai_call step5Per AI-powered step in your workflow.
Cron / webhook trigger1Same as a manual run.
Email notification (platform)1Approval email sent via CFFBRW. BYOS email connectors are free.

BYOA (Bring Your Own Agent) Costs

When you compile workflows via the BYOA MCP server, your own AI model does the heavy lifting. Here's what you pay vs. what's free:

ActionCreditsWhy
validate_plan0Validation is pure computation (no AI call on our side). We want to encourage BYOA adoption.
prevalidate_markdown3This runs our AI model to screen your markdown.
run_workflow1Same as a dashboard run.
AI recovery during run5Recovery uses our AI model regardless of how the plan was compiled.

The compilation AI cost is on your side (billed by your AI provider: OpenAI, Anthropic, etc.). The platform only charges for operations that use our AI models or compute.

Viewing Usage

Go to Usage in the sidebar to see:

  • Current period usage — credits used, credits remaining, reset date
  • Resource counts — active workflows, runs this month, MCP servers
  • Usage history — bar chart of credit consumption over past months
  • Plan details — your current tier and limits

The credit bar changes color as you approach your limit:

  • Green: under 80%
  • Yellow: 80-90%
  • Red: over 90%

Managing Your Subscription

Go to Billing (under Settings in the sidebar) to:

  • View your current plan and billing period
  • Upgrade to a higher tier
  • Manage payment method via the customer portal
  • View invoices and payment history

Upgrades take effect immediately. The credit increase is prorated for the remaining billing period.

Tips to Optimize Credit Usage

  • Use cached compilations — don't edit markdown unnecessarily; same content = 0 credits
  • Test with simple workflows first — debug your markdown before running complex multi-step workflows
  • Use conditional branches — skip expensive steps when they're not needed
  • Leverage MCP tool caching — tool catalogs are cached, reducing redundant discovery calls
  • Use BYOA for iteration — compile from your AI editor (Claude Code, Cursor) and only pay for validation (free) + runs. Your AI provider handles the compilation cost.
  • Use connectors instead of raw HTTP — connector steps get auto-resolved parameter names, reducing compilation errors and retries